The Day by Day Construction Progress at KNLS, 1982/83. 
transpixel
transpixel Foundation for transmission line terminal, fall 1982. transpixel
transpixel
transpixel
transpixel Foundation being readied for antenna slewing switch, fall 1982. transpixel
transpixel
transpixel
transpixel Antenna slewing switch being assembled on foundation, fall 1982. transpixel
transpixel
transpixel
transpixel Concrete counterweights for stabilizing antenna curtain, fall 1982. transpixel
transpixel
[400x278] [739x513][400x278] [739x513][400x278] [739x513][400x278] [739x513]
Foundation for transmission line terminal, fall 1982.
Viewed: 657 times.
Foundation being readied for antenna slewing switch, fall 1982.
Viewed: 734 times.
Antenna slewing switch being assembled on foundation, fall 1982.
Viewed: 689 times.
Concrete counterweights for stabilizing antenna curtain, fall 1982.
Viewed: 649 times.
transpixel
transpixel One of the antenna field foundations, 1982. transpixel
transpixel
transpixel
transpixel Antenna field during antenna construction, winter 1982/83. transpixel
transpixel
transpixel
transpixel Tower conmstruction began with assembly of tower sections on the ground, winter 1982/83. transpixel
transpixel
transpixel
transpixel Assembly of tower sections on the ground, winter 1982/83.  transpixel
transpixel
[400x278] [739x513][400x270] [732x494][400x278] [739x513][400x278] [739x513]
One of the antenna field foundations, 1982.
Viewed: 631 times.
Antenna field during antenna construction, winter 1982/83.
Viewed: 643 times.
Tower conmstruction began with assembly of tower sections on the ground, winter 1982/83.
Viewed: 683 times.
Assembly of tower sections on the ground, winter 1982/83.
Viewed: 685 times.
transpixel
transpixel Tower section ready for vertical assembly, winter 1982/83. transpixel
transpixel
transpixel
transpixel Tower section ready for vertical assembly, winter 1982/83. transpixel
transpixel
transpixel
transpixel Preparing to raise 100 foot section of tower into place, winter 1982/83. transpixel
transpixel
transpixel
transpixel Preparing to raise a 100 foot section of a 363 foot tower, winter 1982/93. transpixel
transpixel
[400x270] [732x494][400x270] [732x494][268x400] [496x740][400x278] [739x513]
Tower section ready for vertical assembly, winter 1982/83.
Viewed: 661 times.
Tower section ready for vertical assembly, winter 1982/83.
Viewed: 666 times.
Preparing to raise 100 foot section of tower into place, winter 1982/83.
Viewed: 692 times.
Preparing to raise a 100 foot section of a 363 foot tower, winter 1982/93.
Viewed: 706 times.
transpixel
transpixel Raising a 100 foot section of a 363 foot tower, winter 1982/83. transpixel
transpixel
transpixel
transpixel Raising a 100 foot section of a 363 foot tower, winter 1982/83. transpixel
transpixel
transpixel
transpixel Raising a 100 foot section of a 363 foot tower, winter 1982/83. transpixel
transpixel
transpixel
transpixel Raising a 100 foot section of a 363 foot tower, winter 1982/83. transpixel
transpixel
[400x278] [739x513][274x400] [504x736][274x400] [504x736][274x400] [504x736]
Raising a 100 foot section of a 363 foot tower, winter 1982/83.
Viewed: 654 times.
Raising a 100 foot section of a 363 foot tower, winter 1982/83.
Viewed: 649 times.
Raising a 100 foot section of a 363 foot tower, winter 1982/83.
Viewed: 646 times.
Raising a 100 foot section of a 363 foot tower, winter 1982/83.
Viewed: 658 times.
transpixel
transpixel Raising a 100 foot section of a 363 foot tower, winter 1982/83. transpixel
transpixel
transpixel
transpixel Raising a 100 foot section of a 363 foot tower, winter 1982/83. transpixel
transpixel
transpixel
transpixel Workman doing tower construction. transpixel
transpixel
transpixel
transpixel Two 363 foot towers in place ready to rig the curtain antenna, winter 1982/83. transpixel
transpixel
[274x400] [504x736][270x400] [494x732][268x400] [496x740][400x270] [732x494]
Raising a 100 foot section of a 363 foot tower, winter 1982/83.
Viewed: 621 times.
Raising a 100 foot section of a 363 foot tower, winter 1982/83.
Viewed: 657 times.
Workman doing tower construction.
Viewed: 663 times.
Two 363 foot towers in place ready to rig the curtain antenna, winter 1982/83.
Viewed: 681 times.
transpixel
transpixel Adjusting guy wires during raising of tower, winter 1982/83. transpixel
transpixel
transpixel
transpixel Special road built to get heavy equipment onto the antenna field, winter 1982/83. transpixel
transpixel
transpixel
transpixel The two 363 foot towers in place ready to rig the curtain antenna, winter 1982/83. transpixel
transpixel
transpixel
transpixel Using a hand winch to adjust guy wires, winter 1982/83. transpixel
transpixel
[400x270] [732x494][270x400] [494x732][270x400] [494x732][400x278] [739x513]
Adjusting guy wires during raising of tower, winter 1982/83.
Viewed: 681 times.
Special road built to get heavy equipment onto the antenna field, winter 1982/83.
Viewed: 672 times.
The two 363 foot towers in place ready to rig the curtain antenna, winter 1982/83.
Viewed: 667 times.
Using a hand winch to adjust guy wires, winter 1982/83.
Viewed: 734 times.
transpixel
transpixel David Johnson assembling part of the curtain dipole antenna, 1983. transpixel
transpixel
transpixel
transpixel The two RF
transmission line exits from the transmitter building to the two antennas. transpixel
transpixel
transpixel
transpixel RF power transmission line to antenna, winter 1982/83. transpixel
transpixel
transpixel
transpixel Dick Ragland and Kevin Chambers constructing RF transmission line, winter 1982/83. transpixel
transpixel
[400x272] [732x497][400x272] [732x497][400x278] [732x509][270x400] [494x732]
David Johnson assembling part of the curtain dipole antenna, 1983.
Viewed: 678 times.
The two RF
transmission line exits from the transmitter building to the two antennas.
Viewed: 654 times.
RF power transmission line to antenna, winter 1982/83.
Viewed: 636 times.
Dick Ragland and Kevin Chambers constructing RF transmission line, winter 1982/83.
Viewed: 660 times.
transpixel
transpixel RF transmission line to curtain dipole antenna, 1983. transpixel
transpixel
transpixel
transpixel RF transmission line to log periodic antenna, 1983. transpixel
transpixel
transpixel
transpixel Rigging the curtain dipole antenna. transpixel
transpixel
transpixel
transpixel Rigging the curtain dipole antenna. transpixel
transpixel
[400x270] [732x494][400x270] [732x494][274x400] [504x736][274x400] [504x736]
RF transmission line to curtain dipole antenna, 1983.
Viewed: 579 times.
RF transmission line to log periodic antenna, 1983.
Viewed: 624 times.
Rigging the curtain dipole antenna.
Viewed: 638 times.
Rigging the curtain dipole antenna.
Viewed: 655 times.
transpixel
transpixel Moving the counter-weights for the curtain dipole antenna, 1983. transpixel
transpixel
transpixel
transpixel Looking up from base of 363 foot antenna tower. transpixel
transpixel
transpixel
transpixel Workman about 200 feet in the air adjusting curtain dipole antenna connections. transpixel
transpixel
transpixel
transpixel That dot in the middle of this picture is a workman adjusting the antenna. transpixel
transpixel
[400x270] [732x494][270x400] [494x732][400x400] [493x493][400x399] [495x494]
Moving the counter-weights for the curtain dipole antenna, 1983.
Viewed: 672 times.
Looking up from base of 363 foot antenna tower.
Viewed: 678 times.
Workman about 200 feet in the air adjusting curtain dipole antenna connections.
Viewed: 669 times.
That dot in the middle of this picture is a workman adjusting the antenna.
Viewed: 662 times.
transpixel
transpixel Kevin Chambers making repairs to antenna.  Kevin was raised from ground on a "chair" suspended from the top-most guy between towers. transpixel
transpixel
transpixel
transpixel Two of the tower erection contractors with Kevin Chambers and Dick Ragland, 1983. transpixel
transpixel
transpixel
transpixel See the two large crates beside the building:  These contain the 100,000 watt transmitter, April 1983. transpixel
transpixel
transpixel
transpixel Transmitter crates being opened for assembly of the transmitter, April 1983. transpixel
transpixel
[400x270] [732x494][400x270] [732x494][400x270] [732x494][400x270] [732x494]
Kevin Chambers making repairs to antenna. Kevin was raised from ground on a "chair" suspended from the top-most guy between towers.
Viewed: 654 times.
Two of the tower erection contractors with Kevin Chambers and Dick Ragland, 1983.
Viewed: 677 times.
See the two large crates beside the building: These contain the 100,000 watt transmitter, April 1983.
Viewed: 679 times.
Transmitter crates being opened for assembly of the transmitter, April 1983.
Viewed: 654 times.