Foundation for transmission line terminal, fall 1982. Viewed: 657 times.
|
Foundation being readied for antenna slewing switch, fall 1982. Viewed: 734 times.
|
Antenna slewing switch being assembled on foundation, fall 1982. Viewed: 689 times.
|
Concrete counterweights for stabilizing antenna curtain, fall 1982. Viewed: 649 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x278] [739x513] | [400x270] [732x494] | [400x278] [739x513] | [400x278] [739x513] |
One of the antenna field foundations, 1982. Viewed: 631 times.
|
Antenna field during antenna construction, winter 1982/83. Viewed: 643 times.
|
Tower conmstruction began with assembly of tower sections on the ground, winter 1982/83. Viewed: 683 times.
|
Assembly of tower sections on the ground, winter 1982/83. Viewed: 685 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x270] [732x494] | [400x270] [732x494] | [268x400] [496x740] | [400x278] [739x513] |
Tower section ready for vertical assembly, winter 1982/83. Viewed: 661 times.
|
Tower section ready for vertical assembly, winter 1982/83. Viewed: 666 times.
|
Preparing to raise 100 foot section of tower into place, winter 1982/83. Viewed: 692 times.
|
Preparing to raise a 100 foot section of a 363 foot tower, winter 1982/93. Viewed: 706 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x278] [739x513] | [274x400] [504x736] | [274x400] [504x736] | [274x400] [504x736] |
Raising a 100 foot section of a 363 foot tower, winter 1982/83. Viewed: 654 times.
|
Raising a 100 foot section of a 363 foot tower, winter 1982/83. Viewed: 649 times.
|
Raising a 100 foot section of a 363 foot tower, winter 1982/83. Viewed: 646 times.
|
Raising a 100 foot section of a 363 foot tower, winter 1982/83. Viewed: 658 times.
|
| | | |
| | | |
|
|
|
|
|
| [274x400] [504x736] | [270x400] [494x732] | [268x400] [496x740] | [400x270] [732x494] |
Raising a 100 foot section of a 363 foot tower, winter 1982/83. Viewed: 621 times.
|
Raising a 100 foot section of a 363 foot tower, winter 1982/83. Viewed: 657 times.
|
Workman doing tower construction. Viewed: 663 times.
|
Two 363 foot towers in place ready to rig the curtain antenna, winter 1982/83. Viewed: 681 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x270] [732x494] | [270x400] [494x732] | [270x400] [494x732] | [400x278] [739x513] |
Adjusting guy wires during raising of tower, winter 1982/83. Viewed: 681 times.
|
Special road built to get heavy equipment onto the antenna field, winter 1982/83. Viewed: 672 times.
|
The two 363 foot towers in place ready to rig the curtain antenna, winter 1982/83. Viewed: 667 times.
|
Using a hand winch to adjust guy wires, winter 1982/83. Viewed: 734 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x272] [732x497] | [400x272] [732x497] | [400x278] [732x509] | [270x400] [494x732] |
David Johnson assembling part of the curtain dipole antenna, 1983. Viewed: 678 times.
|
The two RF
transmission line exits from the transmitter building to the two antennas. Viewed: 654 times.
|
RF power transmission line to antenna, winter 1982/83. Viewed: 636 times.
|
Dick Ragland and Kevin Chambers constructing RF transmission line, winter 1982/83. Viewed: 660 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x270] [732x494] | [400x270] [732x494] | [274x400] [504x736] | [274x400] [504x736] |
RF transmission line to curtain dipole antenna, 1983. Viewed: 579 times.
|
RF transmission line to log periodic antenna, 1983. Viewed: 624 times.
|
Rigging the curtain dipole antenna. Viewed: 638 times.
|
Rigging the curtain dipole antenna. Viewed: 655 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x270] [732x494] | [270x400] [494x732] | [400x400] [493x493] | [400x399] [495x494] |
Moving the counter-weights for the curtain dipole antenna, 1983. Viewed: 672 times.
|
Looking up from base of 363 foot antenna tower. Viewed: 678 times.
|
Workman about 200 feet in the air adjusting curtain dipole antenna connections. Viewed: 669 times.
|
That dot in the middle of this picture is a workman adjusting the antenna. Viewed: 662 times.
|
| | | |
| | | |
|
|
|
|
|
| [400x270] [732x494] | [400x270] [732x494] | [400x270] [732x494] | [400x270] [732x494] |
Kevin Chambers making repairs to antenna. Kevin was raised from ground on a "chair" suspended from the top-most guy between towers. Viewed: 654 times.
|
Two of the tower erection contractors with Kevin Chambers and Dick Ragland, 1983. Viewed: 677 times.
|
See the two large crates beside the building: These contain the 100,000 watt transmitter, April 1983. Viewed: 679 times.
|
Transmitter crates being opened for assembly of the transmitter, April 1983. Viewed: 654 times.
|
| | | |